Renewables and Energy Transition
Arbiter's project experts run multi-discipline completions on carbon capture, solar, hydrogen, hydroelectric and wind projects, with every check sheet, test record and turnover package in one system.
Why it matters
Energy transition projects combine process, electrical and civil scopes that rarely run on the same schedule, often against funding milestones and regulatory reporting. When completions records are scattered, the final weeks become a search for missing paperwork. Arbiter keeps them current from the first check sheet.
One record
Process, electrical and civil scopes in the same system.
Every tag
Traced from drawing to check sheet to turnover package.
Audit-ready
Records kept current for owners, funders and regulators.
Your system
Configured as your own and left with your team.
Where we work
The technology changes. The discipline of tracking every tag from planning to handover does not.
Carbon capture
Carbon capture brings process-plant complexity. We run it the way we run heavy oil and gas facilities: tag by tag, system by system, through to commissioning.
Solar
Thousands of repeating components. Dynamic ITP runs one check across many tags, so blocks turn over as they are finished instead of all at the end.
Hydrogen
Electrolysis, compression and storage packages with demanding testing and safety records, tracked from mechanical completion to commissioning.
Hydroelectric
Mechanical, electrical and civil scopes managed in one record, so the powerhouse and its connection are handed over together.
Wind
Plan of the day, working-at-heights approvals and wind delay thresholds managed alongside every check sheet.
Grid and facility connection
The power generation and facility connection workflows we have refined for over 10 years, applied to renewable generation.
Where projects lose time
Counting tags from drawings by hand takes weeks, so the completions plan is behind before construction starts.
Process, electrical and civil contractors each keep their own check sheets, so nobody can see which systems are actually ready.
When packages are assembled after the work, the gaps surface at commissioning, which is when they cost the most to fix.
How it runs
The same sequence runs whether the project captures carbon, produces hydrogen or generates power from sun, water or wind.
01 · Plan
Systems, subsystems and tags are built into Arbiter from your drawings, saving weeks of setup.
02 · Assign
The right check sheets attach to every tag automatically, and Dynamic ITP runs one check across many tags.
03 · Schedule
Daily work, approvals and field controls are planned in the system, including working-at-heights and weather holds where the work demands them.
04 · Build
Process, electrical and civil crews complete digital check sheets in the field, and deficiencies are tracked to closure.
05 · Turn over
Packages build as work is signed off, system by system, ready for commissioning.
06 · Hand over
Operations receives a complete, current record of every system on the agreed date.
People plus platform
Completion Specialists working for your project leadership, running planning, approvals and completions in Arbiter every day.
We join at planning, ideally, or at mechanical completion or commissioning.
The platform
Drawings turned into a structured, trackable tag register before the field starts.
Learn more →
Digital check sheets completed in the field, against the exact tag.
Learn more →
One inspection and test plan across many tags, signed off together.
Learn more →
Raise, assign and close deficiencies with photos and documents attached.
Learn more →
Current drawings and documents linked to every check sheet.
Learn more →
Turnover packages that build as the work is signed off.
Learn more →
Project synopsis
The core of every innovative project is the power, process and equipment that run it. These innovative outcomes are only possible if the project is successful, and that's where we come in.
-
Sandenn Killoran Director and Commercial Lead
The same team and platform behind more than 2 GW of power generation brought online, applied to carbon capture, solar, hydrogen, hydroelectric and wind.
Compliance and records
DocuLink ties every drawing and document to the check sheets that use it, and keeps the field on the current revision.
One of our prime construction contractors passes external ISO 9001 quality audits on the consistency of its Arbiter records.
FAQ
Question
Answer
Carbon capture, solar, hydrogen, hydroelectric and wind projects, including the grid and facility connection.
Question
Answer
Yes. Our field and planning team works with your team and our success specialists to configure the workflows, checksheets, activities to drive project success regardless of sector.
Question
Answer
Ideally at project planning, so the tag takeoff, check sheets and turnover structure are in place before crews mobilize. We can also join at mechanical completion or commissioning.
Question
Answer
Both. Our Completion Specialists run the work on site in Arbiter, and the platform stays with your team, configured as your own.
Talk to the team
Bring the scope, a set of drawings or your toughest turnover problem, and we'll walk you through how we would plan, staff and run it.