Renewables and Energy Transition

Innovative projects, handed over on time.

Arbiter's project experts run multi-discipline completions on carbon capture, solar, hydrogen, hydroelectric and wind projects, with every check sheet, test record and turnover package in one system.

Why it matters

New technology. The same handover pressure.

Energy transition projects combine process, electrical and civil scopes that rarely run on the same schedule, often against funding milestones and regulatory reporting. When completions records are scattered, the final weeks become a search for missing paperwork. Arbiter keeps them current from the first check sheet.

One record

Process, electrical and civil scopes in the same system.

Every tag

Traced from drawing to check sheet to turnover package.

Audit-ready

Records kept current for owners, funders and regulators.

Your system

Configured as your own and left with your team.

Where we work

Built for the projects driving the energy transition.

The technology changes. The discipline of tracking every tag from planning to handover does not.

Carbon capture

Capture, compression and transport

Carbon capture brings process-plant complexity. We run it the way we run heavy oil and gas facilities: tag by tag, system by system, through to commissioning.

Solar

Arrays, inverters and collection

Thousands of repeating components. Dynamic ITP runs one check across many tags, so blocks turn over as they are finished instead of all at the end.

Hydrogen

Production, compression and storage

Electrolysis, compression and storage packages with demanding testing and safety records, tracked from mechanical completion to commissioning.

Hydroelectric

Turbine-generator and balance of plant

Mechanical, electrical and civil scopes managed in one record, so the powerhouse and its connection are handed over together.

Wind

Electrical completions at height

Plan of the day, working-at-heights approvals and wind delay thresholds managed alongside every check sheet.

Grid and facility connection

Substations and interconnection

The power generation and facility connection workflows we have refined for over 10 years, applied to renewable generation.

Where projects lose time

Where energy transition projects lose weeks.

Takeoff starts late

Counting tags from drawings by hand takes weeks, so the completions plan is behind before construction starts.

Scopes don't share a record

Process, electrical and civil contractors each keep their own check sheets, so nobody can see which systems are actually ready.

Turnover is built at the end

When packages are assembled after the work, the gaps surface at commissioning, which is when they cost the most to fix.

How it runs

One flow from planning to operations.

The same sequence runs whether the project captures carbon, produces hydrogen or generates power from sun, water or wind.

01 · Plan

Tag takeoff and tag count

Systems, subsystems and tags are built into Arbiter from your drawings, saving weeks of setup.

02 · Assign

Check sheet assignment

The right check sheets attach to every tag automatically, and Dynamic ITP runs one check across many tags.

03 · Schedule

Plan of the day and approvals

Daily work, approvals and field controls are planned in the system, including working-at-heights and weather holds where the work demands them.

04 · Build

Multi-discipline completions

Process, electrical and civil crews complete digital check sheets in the field, and deficiencies are tracked to closure.

05 · Turn over

Turnover packages

Packages build as work is signed off, system by system, ready for commissioning.

06 · Hand over

Commissioning and handover to operations

Operations receives a complete, current record of every system on the agreed date.

People plus platform

Experts embedded with your project leadership.

Completion Specialists working for your project leadership, running planning, approvals and completions in Arbiter every day.

We join at planning, ideally, or at mechanical completion or commissioning.

  • Planning and configuration delivered before your crews mobilize
  • Completion Specialists on site, running the work in Arbiter every day
  • The platform stays with you, configured as your own tool

Project synopsis

Energy transition projects, on schedule.

The core of every innovative project is the power, process and equipment that run it. These innovative outcomes are only possible if the project is successful, and that's where we come in.
-
Sandenn Killoran Director and Commercial Lead

The same team and platform behind more than 2 GW of power generation brought online, applied to carbon capture, solar, hydrogen, hydroelectric and wind.

Compliance and records

Audit-ready from the first check sheet.

DocuLink ties every drawing and document to the check sheets that use it, and keeps the field on the current revision.

One of our prime construction contractors passes external ISO 9001 quality audits on the consistency of its Arbiter records.

FAQ

Energy transition questions, answered.

Question

Which renewable and energy transition projects do you support?

Answer

Carbon capture, solar, hydrogen, hydroelectric and wind projects, including the grid and facility connection.

Question

Can Arbiter adapt to our unique requirements?

Answer

Yes. Our field and planning team works with your team and our success specialists to configure the workflows, checksheets, activities to drive project success regardless of sector.

Question

When should Arbiter join the project?

Answer

Ideally at project planning, so the tag takeoff, check sheets and turnover structure are in place before crews mobilize. We can also join at mechanical completion or commissioning.

Question

Do you supply people, software, or both?

Answer

Both. Our Completion Specialists run the work on site in Arbiter, and the platform stays with your team, configured as your own.

Talk to the team

Bring us your next energy transition project. We'll show you the structure.