Data Centers
Power on. On schedule.
Arbiter's project experts take the whole build, from the data center to its power generation and facility connection, through tag takeoff to handover to operations. Every check sheet, test record and turnover package lives in one system.
Why it matters
Every Tag Tracked, Every Test Verified,
One Seamless Handover
From tag takeoff to energization, streamline completions, turnover, and compliance for data centers and the power plants which power them—all in one unified record.
100+ projects
Power Generation and connection projects across the development and refinement of the Arbiter Platform.
2 GW+ online
Of dedicated power brought online across those projects in the last two years.
4,000+ check sheets
Managed, completed and turned over on schedule on just one project.
10+ years
Refining power generation and facility connection workflows.
Where projects lose time
Where data center projects lose weeks.
Takeoff starts late
Counting tags from drawings by hand takes weeks, so the completions plan is behind before construction starts.
Records scatter
Mechanical completion, cable construction and relay test records spread across contractors, binders and spreadsheets. Nobody can see what's actually done.
Turnover is built at the end
When packages are assembled after the work, the gaps surface at commissioning, which is when they cost the most to fix.
How it runs
One flow from planning to operations.
The same sequence runs on the power plant, the facility connection and the data center, so everyone works from one status.
01 · Plan
Tag takeoff and tag count
Systems, subsystems and tags are built into Arbiter from your drawings, saving weeks of setup.
02 · Assign
Milestones Assigned Against Your MC and TCC
Your system matches the project plan and schedule creating a cohesive project execution schedule across the entire spectrum of project activities.
03 · Build
Mechanical Completion
Crews complete digital check sheets in the field, and deficiencies are tracked to closure. Documents, Drawings and Records Seamlessly Kept Up-to-Date.
04 · Test
Test Records
Test records are captured against each tag and flow straight into commissioning.
05 · Turn over
Turnover Dossiers
Packages build as work is signed off, system by system. Through seamless updates to the Dossiers systems, areas, milestones can be turned over without delay.
06 · Hand over
Commissioning and Handover to Operations
The power plant and the data center are commissioned against one record, and operations gets a complete, current set on the agreed date.
People plus platform
A lean team, embedded with your project leadership.
Our team of specialists can assist your project from the planning phase through mechanical completion, turnover and commissioning bringing your project in on schedule to handover.
Our support team can be deployed at multiple stages of a project life-cycle, ensuring that your system and your project goals are realized.
Planning and configuration delivered before your crews mobilizeCompletion Specialists on site, running the work in Arbiter every day
The platform stays with you, configured as your own system
Project Advisors with decades of experience help to overcome challenges before they derail the schedule
The platform
The tools that carry the work.
Tag take-off
Drawings turned into a structured, trackable tag register before the field starts.
Learn more →
SoftChecks
Digital check sheets completed in the field, against the exact tag.
Learn more →
Dynamic ITP
One inspection and test plan across many tags, signed off together.
Learn more →
Actions and Deficiencies
Raise, assign and close deficiencies with photos and documents attached.
Learn more →
Doculink
Current drawings and documents linked to every check sheet.
Learn more →
Turnover/Handover Automation
Turnover packages that build as the work is signed off.
Learn more →
Project synopsis
From planning to handover, on schedule.
There has been nothing that surprised us. Our decades of project experience with power generation and electrical commissioning has yielded amazing results in the field of data centers.
-
Jory Worobec Arbiter Director and Field Lead
Across our data center power projects, more than 4,000 check sheets were managed, completed and turned over on schedule, saving weeks of rework and delays and delivering handover to operations on time.
Compliance and records
Audit-ready from the first check sheet.
DocuLink ties every drawing and document to the check sheets that use it, and keeps the field on the current revision.
One of our prime construction contractors passes external ISO 9001 quality audits on the consistency of its Arbiter records.
FAQ
Data center questions, answered.
Question
When should Arbiter join a data center project?
Answer
Ideally at project planning, so the tag takeoff, check sheets and turnover structure are in place before crews mobilize. We can also join at mechanical completion or commissioning.
Question
Do you supply people, software, or both?
Answer
Both. Our Completion Specialists run the work on site in Arbiter, and the platform stays with your team, configured as your own.
Question
Do you cover the data center, or only the power plant?
Answer
Both. The data center, its power generation and the facility connection are managed in one system by one team.
Question
Who do you work for on the project?
Answer
Your project leadership team. On some projects that is the company delivering the power generation, on others the overall project owner.
Talk to the team
Bring us your next data center. We'll show you the structure.
Bring the scope, a set of single line diagrams or your toughest turnover problem, and we'll walk you through how we would plan, staff and run it.